I received a notice from one of my customers asking us to perform the required wiring changes for the 2.6 software. I downloaded the latest installation manual dated 12/2010. It does not appear that the required wiring changes are posted in this latest manual. Is this correct?
The only data I have at this point is the verbage from the post stating "...serial port outputs from multi-screen SkyView systems must be connected together". Are referring to the male 37 pin connector pins 4, 6, 8, 10, & 12???
If someone knows exactly what needs to be done, it could save the customer some $$$ in paying me for research.
latodd
The only data I have at this point is the verbage from the post stating "...serial port outputs from multi-screen SkyView systems must be connected together". Are referring to the male 37 pin connector pins 4, 6, 8, 10, & 12???
If someone knows exactly what needs to be done, it could save the customer some $$$ in paying me for research.
latodd