What shop time / labor costs are people seeing to upgrade a skyview classic to the equivalent size HDX display? From everything I have read, the physical swap is trivial (with much of the annoyance being directed at the two screws that don't line up and why make the display a different size that requires the gap filler plate?) and ( as long as the configuration is saved and transferred) another hour or two of calibration and configuration refinement. Some experimental owners are saying it is a few hours per display, but I have an SLSA so I am at the mercy of others.
I just had a “dynon authorized center” shop tell me that to swap out my two skyview classics to HDX would take a couple of weeks in the shop and a few days of labor. If I show up with the two displays and the bottom gap-filler plates, I was expecting at most one day of labor, so obviously one of us doesn’t know what they are talking about. But which one of us is it?
I just had a “dynon authorized center” shop tell me that to swap out my two skyview classics to HDX would take a couple of weeks in the shop and a few days of labor. If I show up with the two displays and the bottom gap-filler plates, I was expecting at most one day of labor, so obviously one of us doesn’t know what they are talking about. But which one of us is it?