Langdon
I love flying!
Reading the brochure for the AP controller it can also control pitch and roll trim. I am wondering if you have the Vertical Power electronic breaker system installed if the roll trim switching on the AP controller panel can talk through the SkyView system to the VP-X if it is the designated controller? If not is this a possibility for the future rather than having the secondary control though the VP page in SkyView?
Thanks,
Langdon
Thanks,
Langdon